Heavy-duty diamond-ground epoxy safety walkway system with high-contrast safety yellow borders engineered for chemical resistance and intense forklift traffic.

Location Wetherill Park, NSW
Scope 1,200m² Solid Epoxy
Timeframe Shutdown Schedule